Baan Puri Pool Deck Refurbishment
Rebuilding a subsided pool deck from the sub-base upward.
The existing pool-deck finish and failed sub-base were removed so the underlying cause of settlement could be addressed before the walkways and sandwash finish were reinstated.
- Service
- Pool-deck refurbishment
- Area
- 580 m²
- Location
- Bang Tao, Phuket
Scope at a glance
- Removed the existing sandwash and affected sub-base
- Rebuilt the pool-deck and walkway base
- Relayed the sandwash finish across the renewed areas
9 project images








